How to extend the life of the riveter Carton Rivet Machine | Rivet Machine Manufacturer | Long Rivet Machine 1. Do not machine workpieces other than nominal capacity. 2 , do not work long hours under high pressure. 3 , the protruding length of the rivet head should not exceed the specified value. 4. Abnormal shutdown, maintenance and immediate troubleshooting. 5 , the device guide rails should be applied once a month to make it lubricate and prevent rust. 6 , the installation and disassembly of the rivet head should be light and slow, especially when removing the rivet head, do not use force to pull out, should rotate the rivet head and pull out slowly and forcefully. If the rivet seat of the inserted rivet head is pulled out of the normal position, the position of the rivet head will be obviously biased after installing the rivet head. At this time, the red safety cover should be disassembled and the rivet seat can be used after being installed, otherwise the machine is easily damaged. . 7. When the riveting head is used to process certain materials, slight sticking will occur. To ensure the quality of the riveting, the riveting head should be cleaned periodically to prevent the metal bonding from being thickened. When cleaning, the rivet head is fixed on the chuck of the lathe and then polished with sandpaper. 8. Conduct routine maintenance for the equipment every two weeks. The main maintenance items are as follows. If problems are found, they should be dealt with promptly. A. Check whether the amount of oil in the pneumatic triad oil cup is sufficient, otherwise the oil cup should be filled. B. Check whether the steam pipes and joints are connected firmly and whether there is leakage. C. Check whether there is sticking phenomenon in the rivet head cavity, and clean it if any. D. Add grease to the spherical surface. Â Carton Rivet Machine | Rivet Machine Manufacturer | Long Rivet Machine Website: Â Â Â Â Â   (1) Main product:notebook, diary, organizers, refills, folder, Desk Calendar, notepad, sketchbook, copy paper, jigsaw, DIY album,
(2) Fulfill about 100pcs new design per month.
(3) Strict own QC team to inspect all our goods before packing. Planner Notebook,Design Planner Shenzhen Longyin Printing Packing Co., Ltd. , https://www.longyinprint.com
certificate folder, menus, cover sheets, sticky notes, stationery set, etc.
(4) Support bi-quality checking through ITS, SGS or Bureau Veritas according to clients' requirement.