Kayak Handle,Kayak Carry Handles,Kayak Toggle Handles,Kayak Pull Handle Yongsheng Outdoor Products manufactory , https://www.noahwaterkayak.com
On November 18th, Chongqing Chuandong Shipbuilding Heavy Industry Co., Ltd. held the groundbreaking ceremony for the first 7700-ton refueling vessel.
On May 16 this year, Sichuan Shipbuilding Heavy Industry successfully signed a contract for the construction of a (2+2) 7,700-ton refueling vessel. The refueling vessel has a total length of 101.39 meters, a width of 19.05 meters, a depth of 10.50 meters, a design draft of 6.70 meters, a structural draught of 7.40 meters and a carrying capacity of 7,700 tons. The ship adopts double-shell structure, medium-speed diesel engine, adjustable propeller, and the first side push with frequency conversion control, into the US classification society, infinite navigation area.
In the second half of the year, the production task of Sichuan Shipbuilding Heavy Industry was very heavy. In order to ensure that the 7700-ton refueling vessel could start construction on schedule, the company carried out a lot of meticulous preparations from the aspects of production technology, production organization, material supply and production site before the start of construction.