At present, the assembly shop has been mass-produced, the inspection workshop and the welding shop production line have been put into use, and the welding line equipments for the painting shop and welding shop cab have been installed; the test track has been completed. The second phase of the axle, frame, engine, steering gear and brakes project has been registered in the autonomous region letter and commission. High Speed Precision Press,Metal Dome Punching Press Machine,Shields Punching Press Machine,Usb Outer Shell Punching Press Machine Dongguan Samhoor Precision Machinery Co.,Ltd , https://www.samhoor-press.com
The total investment of 7 billion yuan in Inner Mongolia Jinggong Hengxin Equipment Manufacturing Co., Ltd. heavy truck and special automobile manufacturing projects progressed smoothly, the project a total investment of 7 billion yuan, covers an area of ​​4633 acres, with an annual output of 50,000 heavy trucks, 10,000 special vehicles, points Phase III implementation, initial investment of 2.34 billion yuan, annual production of 10,000 new energy heavy-duty trucks; second phase investment of 3.16 billion yuan, annual production of 50,000 heavy-duty trucks, 10,000 special-purpose vehicles and engines, axles , steering gear, brakes, interior parts and other projects; three-phase investment of 1.5 billion yuan to build an annual output of 5000 passenger cars and modern logistics distribution center. The project started construction in May 2008 and was completed and put into production in May 2010. It is estimated that the project can realize an annual output value of 5.4 billion yuan after the project reaches production capacity. Up to now, a total of 1.98 billion yuan has been invested.