(8) The operation room of the gyratory crusher should be located on the upper edge of the mining bin to facilitate observation of the work of the shunting, unloading, and breakers. fiberglass mesh,Fiberglass Screen,Alkali Resistant Fiberglass Mesh,Square Wire Mesh anping yaqi wire mesh co.,ltd , https://www.yaqiwire.com
The configuration of the crushing machine for the mine is shown in the figure below. There is no fixed strip screen before the coarse crushing. The original mine is directly discharged into the receiving bin through the dump truck and enters the crusher 1. The affected bin is considered according to the volume of the two compartments. The factory column spacing of 14.5m takes into account the inertial displacement during parking and prevents the column from colliding when unloading. The span of the factory building is 13.5m, which is the largest service range with the smallest span of the crane 4, which can hoist the car and hang the crusher and other components. The movable cone was lifted and placed on a cone table of a 10.8 m elevation floor in the 13.5 m span. The depth of the ore mine is considered to be the formation of the ore dead angle. The dumping and unloading should first fall on the "ore ore corner" and then fold back to the star frame to buffer the collision of the gyratory crusher. The gyratory crusher needs to be installed on the reinforced concrete frame structure. The volume of the ore discharge buffer bin below it should accommodate the volume of the ore of the two compartments, and the two electric vibrations are used to feed the mine 2 to the belt conveyor 3. In order to overhaul the transmission device with a height of 0.00m and the components of -11.00mm, there is a crane 5 whose crane track extends out of the factory.
Some projects similar to this one (including some gyratory crusher configurations abroad) are designed in this way:
(1) The span of the crane column is 21m, in order to hang the heavy-duty carriage of the two tracks.
(2) The ore discharge buffer bin is used for the ore mining machine, and its orientation is consistent with the tape conveyor below it. The plate type ore feeder can be installed obliquely, and the installation angle is lighter than 35° and the heavy duty is not more than 12°.
(3) A large breaker is installed above the mine bin. [next]