The Jian'an construction party constitutes the main structure of the wind farm. The construction work includes the construction and maintenance roads of the approach and the wind turbines, the wind turbine foundation, the fan hoisting, the civil engineering of the booster station, the equipment installation and the current collecting lines, etc., which bear various types according to different professional properties. After the establishment of the Jian'an construction contractor, the construction of the wind turbines will be carried out at the same time. The concrete transportation and other criss-crossings determine that various construction and transportation operations are concentrated in a limited and narrow mountainous work area. There must be many coordination problems such as mutual influence and mutual restraint, which also determines the risk throughout the construction process. Always. Risks and Countermeasures For an EPC general contracting project, the impact of natural climatic conditions will lead to the completion of the project construction risk according to the contract, and the risk of construction capital chain scission due to the change of the owner will be fatal. The Shenchi Wind Power EPC project has the most direct impact on the implementation of the project due to the owner's change of capital chain. Welding Components ,Steel Welded Assemblies ,Laser Welding Subassembly,Steel Welded Assembly Ningbo Metal Sharing Supply Chain Management Co., Ltd , https://www.metalsharing.com