On April 1, along with the roar of the machine, the last one of the 56 main items of the Wuhan Ethylene Project, the construction of a ash-concrete field, was started. At this point, 56 major projects in Wuhan ethylene project have been started. As the largest project of Hubei Province's No. 1 project and Sinopec's construction, when Wuhan ethylene is completed, it will promote the rise of central China, optimize the layout of China's petroleum and petrochemical products, and increase the overall strength of the petrochemical industry. The project is planned to be completed by the end of this year and will start in the first quarter of next year. There are 56 main items in this project. Since the project was started on August 28, 2008, after more than two years of hard work by the constructors, seven of the main items have been successfully transferred to the middle, and five main items have entered the “three check and four set†rectification and elimination period. At present, the overall progress of the project is 77.28%. Among them, the design progress was 97.60%, the purchase progress was 86.05%, the construction progress was 75.51%, and the project progress was under control. Hydraulic Adapter,Hydraulic Hose Connector,Hydraulic Adaptor Fittings,Hydraulic Fittings And Adapters Ningbo Xintai Industry and Trade Co., Ltd. , https://www.nb-xintai.com