Jaw crusher storage problems during downtime can not be small virtual

The jaw crusher should start the engine once a month during the shutdown to make the machine run at a short distance, so that a new oil film can be established at the lubricating parts to prevent rust. It should be noted that: Before starting, it should be filled with cooling water, at the end of which cooling water should be drained; [b][url=http://]Ball Mill[/b],[b][url=http:/ /] Sand making machine [/ url] [/ b], [b] [url = http://] milling machine [/ url] [/ b], the other is before the jaw crusher is stored, should look outside The size of the surface of the surface of the anti-rust paint peeling paint is determined by the method of applying paint or repainting the entire machine. The working equipment of construction machinery, such as the screed of the paver, the bucket of the loader, the scraper of the grader, etc., is applied with grease to the rust-proof method of the bare metal. For the storage of the jaw crusher, you can't care less. You know how different it is when you save it and when it is not saved. drying/

Pet Chips Bottle Grade

Pet Chips Bottle Grade,Pet Crisps Bottle Grad,Plastic Raw Material Resin,Bottle Grade Virgin Pet Resin

Jiangyin jietong international trade company , https://www.jietongpetresin.com